Infrastructure and Amenities
Adaptable and expandable multi-building campus,
with room for significant expansion to accommodate a wide range
of businesses. Four warehouses on site: Number 1 is 72,000 square
feet, number 2 is 77,400 square feet, number 3 is 80,000 square
feet, and number 4 is 39,600 square feet.
- Adequate on-site employee parking.
- Extensive bulk dry ingredient off-loading,
storage, and distribution.
- 8,000 square feet administration office
- 5,000 square feet partially equipped laboratory
on site.
- In-ground ingredients scale.
- Fully improved external storage and staging
areas.
- Excellent truck access to/from freeway.
- Approximately 752,004 square feet of buildings
available on more than 50 acres.
- Steel construction, with ceilings to 28
feet clear.
- Twelve (12) truck high loading docks.
|
- Calpine Cogeneration plant currently provides
22,000 lbs of steam per hour to the facility, up to 200,000 lbs/hr.
can be provided.
- State of the art distillation facility on
site, currently making over 8,500,000 gallons of distilled water
annually.
- Electrical capacity: 60 KV comes into the
substation below the plant on Metz Road and is dropped down to
12 KV for distribution to the plant. There are 7 transformers
within the plant that drop the voltage to 480V through a network
of above and underground wires. PG&E's most economical rate.
- Large volume natural gas to site.
|
- Three (3) onsite water wells.
- Readily available water, sewer, and air
capacity permits.
- Industrial sewer capacity of over 2,000,000
gallons per day. Extensive wastewater screening/cleaning system
on site.
|
- Extensive security, including chain-link
fencing gated access with guard station, and monitored surveillance.
|
- Code compliant fire-suppression sprinkler
system.
- Wet sprinkler system with above-ground tank
and diesel booster pump.
|
|